Tekmar essay e 005

It is your responsibility to ensure that this control is safely installed according to all applicable codes and standards. Standard 18 AWG solid wire is recommended for all low voltage wiring to this control.

Caution Improper installation and operation of this control could result in damage to the equipment and possibly even personal injury. The sensor should be placed approximately 3 feet 1m from the edge of the slab. A good quality electrical test meter, capable of reading from at least 0 — Volts, and at least 0 — 2, Ohms, is essential to properly test this control.

Step One Getting ready Check the contents of this package. Carefully read the Sequence of Operation section in this brochure to ensure that you have chosen the proper control and understand its functions within the operational requirements of your system.

Do not connect either of the transformer secondary wires to ground. A Class 2 transformer must be used. This electronic control is not intended for use as a primary limit control. Test the sensors according to the instructions printed in the enclosed Data Brochure D Testing and connecting the wiring Caution These tests are to be performed using standard testing practices and procedures and should only be carried out by properly trained and experienced persons.

Do not connect the wires to the terminals yet.

Installation, Step four, Step one – tekmar 650 Snow Melting Control User Manual

Step Three Rough-in wiring All electrical wiring terminates in the two wiring chambers at the bottom front of the control.

At no time should voltages in excess of 28 V be measured at any of the wires connected to the control. If any of the contents listed are missing or damaged, please refer to the Limited Warranty and Product Return Procedure on the back of this brochure and contact your wholesaler or tekmar sales agent for assistance.

Turn on the 24 V ac power supply and, using a voltmeter, you should measure between 20 and 28 volts between the power and common terminals. Run the wiring back to the control but do not connect the wires to the terminals yet. If the control is to be mounted on an electrical box, the wiring can be roughed-in at the electrical box prior to installation of the control see Brochure D • Essay EEssay E Note: Carefully read the Sequence of Operation section in this brochure to ensure that you have chosen the proper control and understand its functions within the operational requirements of your system.

Please refer to Essay E Control Functions and Benefits for a detailed description of these features.

Tekmar Essay E 005 – 678442

Application The tekmar Universal Reset Control is designed to maximize the comfort and efficiency provided by a. Please refer to Essay E Control Functions and Benefits for a detailed description of these features. Application The tekmar Boiler Control can control the supply water temperature on up to three modulating boilers.

Buy Tekmar Today. Check the Tekmar - Ohm Converter - mA to Ohm ratings before checking out. - Application Brochure Boiler Control A 10/03 Features of the Boiler Control Please refer to Essay E Control Functions and Benefits for a detailed description of these features. Application The tekmar Boiler Control can control the supply water temperature from up to 9 on / off stages based on outdoor temperature, control.

- Application Brochure Snow Detector & Melting Control A 12/09 Application Please refer to Essay E Control Functions and Benefits for a detailed description of these features.

tekmar Control Systems Ltd.

Download
Tekmar essay e 005
Rated 0/5 based on 56 review